New roofs & re-roofs

New roofs & re-roofs in Croydon

The biggest job your house will ever need doing, so everything goes in writing: the scope, the materials by name, the stage payments, and the 10-year workmanship warranty.

Fastest, and always right for emergencies

Call now

The quickest way to a straight answer about your roof, and if water’s coming in, always start here.

Call 020 4652 1477
Can’t talk? Snap it and send it

Text us a photo

Snap the problem from the ground and text it with your postcode. You’ll get a straight answer about what happens next.

Text a photo
Prefer WhatsApp? Send the photo here Bigger job? Request a roof check

Sounds like your roof?

Signs it might be more than a repair

  • You’re paying for repairs every winter, in different places each time
  • Tiles keep slipping: the nails holding them have rusted through
  • The felt under the tiles is brittle, torn or raining dust in the loft
  • Battens feel soft or crumble where they’re fixed
  • The ridge line has a visible sag or wave in it
  • Neighbours with the same era of house are all re-roofing

Even with all of those. The answer starts with a roof check, not a doorstep verdict. Sometimes what looks terminal is fixable, and we’ll say so.

What we actually do

Stripped to the deck and rebuilt properly

A re-roof done right starts with everything off: tiles, battens, felt, back to the timbers. The timbers get checked and repaired. That’s the moment to fix a century of quiet movement, and the reason a proper quote states a timber contingency instead of pretending surprises can’t happen.

Then it’s built back up: breathable membrane, new battens set to gauge, and your choice of covering: concrete tile, clay, natural or man-made slate. Ridges and hips bedded or dry-fixed as the roof and the exposure demand, leadwork renewed where it meets walls and chimneys. Which covering you pick is one of the biggest things moving the final number, and what actually drives a new roof price is worth reading before you compare quotes.

You’ll know the schedule before we start, scaffold goes up and comes down on stated dates, and the site gets left tidy every night. You live there; we just work there.

Every re-roof includes

  • Full strip-off with waste priced in from the start
  • Timber inspection and repairs, with any contingency stated
  • Breathable membrane and new battens throughout
  • Tile or slate options quoted by name, not “tiles”
  • New leadwork at chimneys, abutments and valleys
  • The 10-year workmanship warranty, in writing

How the quote works

A straight answer, in writing

Photos first if it’s a repair; a proper look if it’s bigger. Either way the scope and the price go to you in writing, itemised, before any work starts, and the person quoting knows the crew doing it.

How we quote, in full →
8On the crew
3Fully qualified roofers and carpenters
15Postcode districts covered
10Year workmanship warranty on new roofs

Our work

Straight off the crew’s phones

No staged shoots. This is what the work actually looks like mid-job and finished. More lands here as jobs wrap up.

Stripped to the rafters: the honest starting point of a re-roof
Stripped to the rafters: the honest starting point of a re-roof
Re-slating around a dormer on new membrane and battens
Re-slating around a dormer on new membrane and battens
A box gutter rebuilt and re-felted
A box gutter rebuilt and re-felted
New lead apron dressed around a chimney
New lead apron dressed around a chimney
Breathable membrane and battens set to gauge
Breathable membrane and battens set to gauge
A flat roof finished in new membrane
A flat roof finished in new membrane
Lead soakers stepped into plain tiles
Lead soakers stepped into plain tiles
A finished felt gutter detail, edges dressed
A finished felt gutter detail, edges dressed

What drives the price

What actually moves a roofing quote

Size and pitch

More roof and steeper pitch mean more materials and slower work. Two houses on one street can price very differently.

Covering choice

Concrete tile, clay and slate sit at different points on cost and lifespan. We lay out the honest trade-offs for your roof.

Hips, valleys and dormers

Every junction adds cutting, leadwork and time. A plain gable-to-gable roof is the simplest job there is.

Scaffold

A full re-roof needs proper access all round. It’s quoted as its own line so you can see exactly what it costs.

What the strip-off finds

Rot and worm only show once tiles lift. The quote states a contingency and the rate, so even that has no surprises.

Waste

A roof’s worth of old tiles and felt has to leave site legitimately. It’s in the quote, not added after.

We don’t publish ballpark figures: a number invented without seeing the roof is exactly the doorstep trick this page exists to avoid. What we will do is put a real one in writing: here’s how the quote works.

What’s covered

Straight about what’s covered, before you pay, not after

The most common roofing fallout isn’t bad work. It’s cover people assumed they had. So here it is in a table, up front.

WorkWhat it comes withHow long
New roof / full re-roofOur written workmanship warranty10 years
Flat roof in EPDM or GRPManufacturer-backed cover on the material, plus our workmanship warrantyPer the material system
RepairsA straight answer instead of paperwork: what we did, what it should hold, and anything we’d keep an eye on,

A repair doesn’t come with a written warranty, and we tell you that before we start, not after it rains. If a repair isn’t worth doing, we’d rather say so.

Reviews

What customers say

Straight from our Google profile, quoted word for word. Read them all on Google →

John Maxa month ago
Roofing Croydon did an excellent job with our roof replacement. The team was professional, efficient, and kept us updated throughout the whole process. The work was completed to a very high standard, everything was left clean and tidy…

Posted on Google, 5 out of 5

Hassnain Alia year ago
Fantastic job—finished on time, no mess left behind, and the new roof is of top quality. Highly recommended!

Posted on Google, 5 out of 5

Kainat Rajpoota year ago
Fantastic work! The team was prompt, professional, and delivered top-quality results. The roof looks great—couldn’t be happier!

Posted on Google, 5 out of 5

Mustafa Ismaila year ago
Lovely friendly professional workmen. Great communication from these guys! Worked around us, and did it promptly. Thanks for a great service!

Posted on Google, 5 out of 5

Samar Zahida year ago
Amazing work done. My roof looks very nice Will recommend them to others.🙌

Posted on Google, 5 out of 5

Questions

Straight answers

Do I actually need a new roof?

Maybe not, and we’ll tell you if you don’t. Plenty of roofs written off on doorsteps have another decade in them with the right repair. The roof check settles it with evidence: photos, the state of the felt and battens, and a written recommendation either way.

How long does a re-roof take?

It depends on size, pitch and weather, so we won’t invent a number here: the honest answer goes in your quote as a schedule, with the scaffold dates stated. What we can say: you stay living at home throughout, and the roof is never left open overnight.

What does the 10-year warranty cover?

Our workmanship on the new roof, in writing. If something we built fails in that time, we come back and put it right. Materials carry their manufacturers’ own cover on top. What it isn’t is a vague verbal promise: you get the terms on paper with the completion paperwork.

How do payments work?

A deposit of 20 to 25% books the job, the balance goes in stages tied to progress, scaffold up, mid-fix, completion, and it’s all set out in the quote before you pay anything. Bank transfer.

Can you match my neighbours’ roofs?

Usually, yes. Most streets round here were built with a handful of tile types, and current ranges cover them well. Where an exact match is impossible we show you the nearest options rather than pretending.

Start with a roof check

We look properly, show you what we found, and put the price in writing, with the warranty terms, the schedule and the stage payments all stated before you decide anything.

WhatsApp / Request a roof check / info@roofingcroydon.com

Call now Text a photo